NEW QUESTION # 14
How does SUM recognize modificattion adjustment transports from predecessor systemms?
- A. By searching for transport requests named <sid>KO<number>
- B. By searching for transport requests in file umodauto.lst
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests that are assigned to project SAP ADJUST
Answer: B
NEW QUESTION # 15
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Central Instance
- B. Transition Server
- C. Migration Hub
- D. Migration Server
Answer: D
NEW QUESTION # 16
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?
- A. Check the compatibility of custom code with SAP S/4HANA.
- B. Perform the migration of data to the new data structure.
- C. Run the database migrationn to the SAP HANA database.
- D. Solve problems from the si mplification item (SI) checks.
Answer: A
NEW QUESTION # 17
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
- A. Assign the transport requesst as a modification adjustment transport.
- B. Release the transport request containing the modification adjustment.
- C. Create new versions of the objects you need to adjust.
- D. Manually activate the adjussted dictionary objects.
Answer: A,C
NEW QUESTION # 18
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?
- A. During the Postprocessing roadmap step
- B. Before the start of the SUM technical downtime
- C. During the Preprocessing rooadmap step
- D. After SUM has ended
Answer: D
NEW QUESTION # 19
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.
- A. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
- B. Activate the required business functions manually in the production system.
- C. Import a transport request from the development system that contains the reccording of the activation.
- D. During conversion, SUM deelivers some business functions already activated.
Answer: C,D
NEW QUESTION # 20
Which of the following scenarios dooes Software Update Manager cover? Note: There are 2 correct answers to this question
- A. New Implementation
- B. Conversion to SAP S/4HANAA Cloud Public Edition
- C. Conversion to SAP S/4HANAA on-premise
- D. Conversion to SAP S/4HANAA Cloud Private Edition
Answer: C,D
NEW QUESTION # 21
What is the benefit of using the UPGANAXML file from a previous SUM run?
- A. To make the progress information within SUM UI more accurate
- B. To repeat specific phases during the SUM run
- C. To auto-fill specific fields onn selected screens on the SUM UI
- D. To skip selected phases durring the SUM run
Answer: A
NEW QUESTION # 22
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Install add-on SAP Gatewayy 7.50.
- B. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
- C. Delete client 066 (Early-Waatch client).
- D. Perform the custom code adjustment.
Answer: B,C
NEW QUESTION # 23
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.
- A. In Process Control Center
- B. In DMO Migration Preparattion
- C. In SUM Parameters
- D. In SUM Analysis
Answer: A,C
NEW QUESTION # 24
When using the DMO of SUM, whicch files can be handled by SUM in the download direectory? Note:
There are 2 correct answers to this question.
- A. Parameter file SAPup_add.par
- B. MIGRATE_DT_DUR.XML filee from a previous run
- C. Breakpoint configuration fille SAPUPPHAS.BRK
- D. Stack XML file calculated byy the maintenance planner
Answer: B,D
NEW QUESTION # 25
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?
- A. The SAP Support Packages that will be bound to the conversion
- B. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
- C. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
- D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
Answer: B
NEW QUESTION # 26
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?
- A. To optimize the activation
- B. To optimize the main import
- C. To optimize the conversion
- D. To optimize the migration
Answer: D
NEW QUESTION # 27
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 28
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.
- A. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
- B. Check the log files written in the SUM directory, subdirectory abap, subdirectory log
- C. Check logs for jobs starting with RSUPG SGEN in the SAP system.
- D. Check the Charts Control Ceenter in the SUM UL
Answer: B,D
NEW QUESTION # 29
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running
- C. Without table contents commparison, only 40 R3load processes are being started.
- D. SUM is still running in uptimme; the 40 defined R3load processes are considered.
Answer: B
NEW QUESTION # 30
......
Get Top-Rated SAP E_S4CON_2025 Exam Dumps Now: https://braindumps.exam4docs.com/E_S4CON_2025-study-questions.html